NB Muleless

NB Muleless
Moored at Alrewas Sept 2013

Sunday 16 June 2013

The finish is in sight

Sorry for the gap in posting – but there wasnt an awful lot to see last week. There is a lot of work being done in the background, and lots of small finishing touches at the moment.

So here are the highlights from last week.

Picture 010

Pigeon boxes have been lined in oak.

Picture 012

Mushroom vents have been painted satin black and fitted.

Other work had been done in preparation for this week.

Picture 009

The hearth has been tiled and the stove placed in position ready for fitting.

Picture 011

Bathroom sink and tap fitted.

Picture 017

Oak trim finished in bedroom.

Picture 018

Oak floor in bedroom.

The ballast has been adjusted – and is hopefully correct for final levels.

Oh – and the best bit this week – the signwriter has been busy.

Picture 002

Picture 005

So thanks to Kevin Regan for a fantastic job – we are now officially NB Muleless!!!