Sorry for the gap in posting – but there wasnt an awful lot to see last week. There is a lot of work being done in the background, and lots of small finishing touches at the moment.
So here are the highlights from last week.
Pigeon boxes have been lined in oak.
Mushroom vents have been painted satin black and fitted.
Other work had been done in preparation for this week.
The hearth has been tiled and the stove placed in position ready for fitting.
Bathroom sink and tap fitted.
Oak trim finished in bedroom.
Oak floor in bedroom.
The ballast has been adjusted – and is hopefully correct for final levels.
Oh – and the best bit this week – the signwriter has been busy.
So thanks to Kevin Regan for a fantastic job – we are now officially NB Muleless!!!
Looking fantastic won’t be long now.