NB Muleless

NB Muleless
Moored at Alrewas Sept 2013

Sunday 30 June 2013

Getting Close Now!

Again, sorry for the gap in posting, we have been up to the boat twice , but didn't take pictures the first visit as there wasn't a lot to see again!

Second visit was much better – not only had more visible work been done, but Muleless was outside as well – so much nicer than being in the shed!

Picture 013

Stove now connected and trim finished round tiles.

Picture 020

Drinking water tap now fitted.

Picture 023 Picture 007

Pigeon boxes now complete – fully lined and prisms fitted.

Picture 028

Bedside lights and heating controls fitted.

Lots of work has been done in the “utility room”.

Picture 032

Extra slim washer/dryer positioned.

Picture 031

Boot/shoe cupboard built (we don't think the shelf is actually crooked – just an optical illusion – will check next visit!)

Picture 034

Steps well under way, bottom step will slide in to access washing machine. All steps have storage.

We spent a very happy couple of hours on the boat in the sunshine, and were able to admire her new livery from a distance.

Picture 037

All the cupboards have shelves now, and the doors have been made and should be fitted by next visit.

Thanks to Waiouru for keeping an eye on Muleless and the guys working on her (they were amazed that they had been spotted!). We were sorry to have missed Tom and Jan!

We will be back up to the boat early next week – and hopefully will soon have a launch date!!!!

1 comment:

  1. Wow - she looks amazing. Thanks for your kind comments on our blog (nb Tentatrice). I will follow you with interest and am eagerly waiting for your maiden voyage.

    ReplyDelete