NB Muleless

NB Muleless
Moored at Alrewas Sept 2013

Saturday, 27 September 2014

Leaving the Ashby Canal and heading to Coventry

I have so much to catch up, I am going to try to keep this brief!

The day after our train ride to the Shackerstone Festival we visited the Battlefield Site. The sun was out and it was a fabulous day. We passed the sundial and checked out the museum shop and cafe – but didnt go in.

DSCF4858

We did the circular walk down to Sutton Cheney Wharf and back along the canal, detouring back to Shenton Station for a drink and snack, and then back along the canal towards the boat.

Here we were passed by a flurry of working boats on their way back from the festival – good job we went on Saturday to see them all!

There was a bit of tricky manoeuvring on the big bend past the battlefield moorings, as a moored boat, and a boat coming from under the bridge made it a tight squeeze when towing laden working boats!

DSCF4885 DSCF4888

The next day we headed back to Market Bosworth, where, whilst filling with water, fuel boat Auriga squeezed in between us and the bridge so they could go shopping – as the actual mooring spots were not deep enough and he couldnt get any closer than 4 ft!

DSCF4923

We then moored up and waited for Mark on Callisto to stop by to fill us with diesel.

DSCF4927DSCF4929

Good job there was still room to pass!

The next day started with the now customary reverse back to the water point – this time ably assisted by the neighbours!

DSCF4938

We then set off again to the top of the Ashby Canal, as we had been told that the new bit was being filled with water!!!!!

After a pleasant journey in lovely weather again we passed through Shackerstone and along some very pleasant stretches of canal.

DSCF4952

When we arrived at the top of the canal, we asked nicely, and were allowed to reverse through the swing bridge and moor on our own private bit of the canal in the sun!

DSCF4954

We wandered up to see how the new bit was coming along, and got chatting to the site manager, who kindly let us through the fence to see the progress!

DSCF4960

We were amazed to see how much water was already in it! That is a 4 inch pipe bringing water through the “bung” from the rest of the canal - it is not being pumped!

Apparently the level was rising at 8 inches a day!

DSCF4957

This pipe has a tape measure attached and is clearly marked with the depth.

DSCF4959

They left us to marvel at the sight of the canal in water!

The next day, this strange craft arrived to be put into the canal down the slipway, and Gary went to give a hand with the canopy!

DSCF4965

All became clear when they eventually “steamed” past us on their way to Coventry for the weekend!

DSCF4976

We checked the water level in the new bit – and were amazed to see how high it was!

DSCF4969DSCF4972

We had intended to walk into Measham – but as it was hot we ended up just going for a drink in the Globe, where we were joined by the crew of NB Alouise, who we invited back to Muleless for drinks later – sorry guys its been so long I have forgotten your names – will look out for you near Blisworth!

Before we left the next day we checked out the levels again – not far to go now!

DSCF4988DSCF4987

Once the water is level with the main canal the pipe will be “turned off” and the water level monitored for a few weeks to make sure there are no leaks and then the clay “bung” will be removed and the new stretch will be open to boats! Keep a look out for information – I imagine they will have a “grand opening” event!

We now had the chance to moor and look round Shackerstone itself, so we started with a nice meal in the Rising Sun, where we got chatting to the crew of NB Seventh Heaven, who have just moved to Bosworth Marina.

The next day we tried to look round Shackerstone Station again, but unfortunately for us there was a “Fireman Sam” event on and no platform tickets were being issued. Instead we walked down the towpath to Congerstone for a drink, and found NB Seventh Heaven having a spruce up.

DSCF4993

Pam and Pete with dogs Poppy and Annie.

We were now on a new mission – we needed to equalise our batteries – we hadnt been on mains electric since 14 July in Cropredy Marina, and to keep our batteries at their best performance they need to be trickle charged back up to 100% every couple of months.

We had booked ourselves into Trinity Marina for 16/17 Sept and after stopping off at Bridge 23 Farm Shop again to stock up on their goodies (including sausages this time!) we made our way down to Hinckley and into the marina.

DSCF5023

The visitor moorings are directly opposite the entrance – amongst the sale boats!

We were soon settled on our (short) pontoon and plugged in to the electric.

DSCF5027

We treated ourselves to an Indian Takeaway from the Simla Restaurant just across from the marina – we thoroughly enjoyed it, next time we might “eat in” instead.

The next day we made our way to Tesco for a top up shop – and got a taxi back with all our goodies!

DSCF5031

We left in the afternoon and moored up just a short way down the canal by the Lime Kilns pub – our last night on the Ashby!

I didnt sleep too well – too much traffic passing on the A5 and the cockerel at the pub helping out too!

DSCF5035

DSCF5032

Good job it was only one night! After filling with water, we moved off and after just over 3 weeks finally left the Ashby Canal (all 22 miles of it!) through the old stop lock and turned left, heading to Hawkesbury Junction and Coventry!

DSCF5053

Friday, 19 September 2014

Steam Trains and Working Boats at Shackerstone Festival

On Saturday 6 September (I know – that was ages ago - I have a lot of catching up to do!) we treated ourselves to a sausage sandwich for brunch to last us through the day, and set of on the walk to Shenton Station to catch the train.

We bought our tickets (£10 each for as many trips on the train you can fit in on a day!) and had a drink on the platform whilst waiting for the train.

Near enough on time there was a blast on the train whistle as it approached the station, and there was a flurry of train spotters (including me) with cameras ready!

DSCF4744

The train stopped at the station, and loads of people got off – ready to watch the engine un-couple from the front of the train and move onto the back!

DSCF4748DSCF4751DSCF4754DSCF4756DSCF4757

Everybody that was travelling then got on the train, and with another whistle, it pulled away.

Gary being a seasoned railwayman made straight for the First Class Lounge Bar Carriage and ordered us some liquid refreshment!

DSCF4759DSCF4762

DSCF4760DSCF4761

It was difficult taking pictures out of the window – as I kept getting soot in my eyes!

DSCF4763DSCF4767DSCF4768DSCF4769DSCF4770DSCF4771

We passed several “restoration projects” and the train stopped at Market Bosworth Station to pick up more passengers and after about 25 minutes we arrived at Shackerstone Station.

Everyone got off the train, and again the engine had to be un-coupled and moved to the front.

DSCF4777DSCF4779DSCF4780DSCF4782

After topping up the firebox with coal, and a few checks on the wheels and things (the “wheel tapper” in action) the new load of passengers were on their way with another blast of the whistle and loads of smoke and steam!

DSCF4789

We decided to walk over to the festival site before looking around the station any more – as we had to be back for the last train at 4.15pm!

We had a slow walk past all the historic boats, had a chat to Mark on fuel boat Callisto to find out when he would be passing us on his way back, and walked past some of the other festival goers boats too!

DSCF4792DSCF4793DSCF4795DSCF4796DSCF4797DSCF4798DSCF4799DSCF4800DSCF4801

As you can see, there were a lot of boats squeezed into the space!

We didnt go into the festival site itself, but did look through the gate to watch some “jousting”!

DSCF4802

Feeling the need for some edible refreshment, we returned to the station to visit the Victorian Tea Shop!

After a pot of tea and some lovely carrot cake and lemon cake we had a further look around the station and museum.

An extra treat was the Blue Circle Steam Engine doing a special showing!

DSCF4810DSCF4811

By now it was near 4pm, so we made our way to the platform to wait for the train and just then the air display at the festival started, so we watched the breathtaking manoeuvres of the 3 planes!

DSCF4812DSCF4814DSCF4818DSCF4820DSCF4827DSCF4828

As you can see, the train pulled in as the display ended, and started its usual routine to move the engine to the front of the train.

Again more coal was added to the firebox – it must be hot up there!

DSCF4832

Then all too soon it was time to get on board for our trip back, with more whistle blowing we pulled out of the station, passing the engine sheds, where another engine was being restored, and the signal box.

DSCF4836DSCF4839DSCF4840

At Shenton Station I didnt want to leave until getting yet another shot of lots of steam from the engine!

DSCF4851

We walked back to the boat exhausted from such a fun packed day!